Technology
The industrial technology and the software behind the transition, including where it fails.
-
Featured Hydrogen Case study
What a hydrogen furnace actually costs a Swedish steelmaker
Capital cost, power price, and the contracts that still decide whether the switch happens.
-
Industrial heat
Industrial heat pumps reach 200°C at a Belgian chemical plant
Process heat was the part of the factory that electrification could not reach.
-
Scope 3
Scope 3 Case study
Scope 3 software: what three tools got wrong in a supplier pilot
A buyer tested three platforms on the same 200 suppliers and compared the results.
-
Storage
Storage
Factory battery storage pays back on peak power prices
Batteries bought for resilience are now earning their keep on the tariff.
-
Cement
Cement Case study
A cement kiln trial with calcined clay cuts clinker, not output
The first winter of data will decide whether the line is rebuilt or only blended.
Partner Industrial heat
When a factory heat pump pays back, and when it does not
A plant-level look at temperature, power price, and the contract that decides the investment.
Provided by Helion Process